Truro Tidal Gate

Project Overview

The Truro Tidal Gate project was a major flood defence overhaul designed to replace the existing tidal defence gates, which had reached the end of their serviceable life. The installation of the new tidal barrier secures the city’s flood defences for the next 30 years, safeguarding up to 185 commercial and residential properties. The project began in April 2024 and was completed in November 2025. It involved complex operations, including installing the new gates using a 400-tonne crane during spring tides.

Scope of the work

Topan was contracted by Kier Natural Resources, Nuclear & Networks to provide specialist security fencing for the control centre.

The scope of work included:

  • High-Security Fencing- supply and installation of SR4 high-security fencing, including both dug-in and bolt-down posts, security toppings and a matching gate.
  • Turnkey Installation Methods- involving installation over and across the water with an experienced, trained operative manning a man basket.

The Solution

Topan delivered a tailored fencing package to meet the significant security and logistical demands of the project, collaborating closely with Kier throughout.

The solution involved:

  • Use of durable, weather-resistant fencing materials suitable for the coastal/estuary environment surrounding the tidal gate.
  • Bespoke fabrication of an angled barrier to replicate the existing structure.
  • Installation of permanent security fencing (a high-security 2.4m high bolt-down Vmesh fencing system) around the operational hub of the new tidal barrier to ensure the integrity and reliability of the flood defence assets throughout their 30-year operational life.

The Outcome

Topan completed the required security fencing, enabling the project to be completed on time. The project has been awarded the Judges’ Special Award Winner at the ICE South West Civil Engineering Awards 2025.

 

“Topan are a trusted part of our supply chain and once again have provided a quality product at Truro. Their site installation team have been brilliant throughout and have helped Kier to deliver this exceptional project on behalf of the Environment Agency”.

Mark Lunn, Project Manager

Explore Other Projects